Window Sticker

Kunes Price

$51,038
1/29

Estimate your vehicle's value in less than 20 seconds.

Get an estimate of your vehicle's trade-in value, based on real local market data — in under 20 seconds.

Powered by

motive logo

2026 Dodge® Charger

R/T

  • MSRP (Including Destination Charges)
    $60,695
  • Dealer Services Fee
    +$599
  • Electronic Filing Fee
    +$38
  • Dealer Discount
    -$4,651
  • Total Selling Price
    $56,681
  • Tax, Title, & License Extra
  • Total Rebates / Cash Allowance
    -$5,643
  • 2026 National Employee Pricing Plus Retail Bonus Cash
    -$1,000
  • Employee Price Dealer Disc. (Retail Purchase only)
    -$4,643

  • Net Price
    $51,038

Let's get started

— or —

We make it easy

Tell us about your desired payment and what you want for your trade-in vehicle.

The 125-point inspection

Every No Fear vehicle earns it.

Before this 2026 Dodge Charger could wear the No Fear badge, an ASE Certified technician worked it end to end — reviewing and repairing where needed across six standards, then road testing it to confirm nothing was missed. Vehicles may be subject to open safety recalls — check any VIN free at NHTSA.gov/recalls.

Inspection Schematic · NF-125 Crew-cab pickup schematic showing the six No Fear inspection zones 1 2 3 4 5 6

Mechanical

Zone 01 / 06

    Final step: full road test to confirm no further issues

    Estimate your payment

    Get a quick payment estimate based on basic loan terms.

    Basic information

    Stock #

    VIN

    Description

    Explore the thrilling 2026 Dodge Charger R/T, a sedan that blends performance with bold style. This eye-catching vehicle is designed for the spirited driver, offering a vibrant experience on every journey.

    The exterior, finished in a stunning Bludicrous color, is sure to turn heads on the road. The aggressive lines and muscular stance reflect Dodge's commitment to a daring design. The Charger R/T features a 4-door configuration, blending practicality with sporty aesthetics.

    Step inside to a sleek interior adorned in Black Artificial Leather. The cabin is crafted to provide comfort and sophistication, perfect for both daily drives and epic road trips.

    Under the hood, the Charger R/T is powered by a potent 3.0L I6 Turbocharged DOHC 24V engine, delivering 420 horsepower. This impressive engine is paired with an 8-speed automatic transmission, ensuring smooth and dynamic performance on every drive.

    Performance and Features:

    • 3.0L I6 Turbocharged engine
    • 420 horsepower for exhilarating performance
    • All-Wheel Drive (AWD) for enhanced traction and control
    • 8-Speed Automatic transmission for seamless gear shifts

    Inside, the Charger R/T is equipped with:

    • Black Artificial Leather Seats for premium comfort
    • Spacious 4D Sedan body for ample passenger space
    • Modern infotainment system for connected driving

    Experience the power and allure of the 2026 Dodge Charger R/T at Kunes Chrysler Dodge Jeep RAM of Platteville. Proudly serving Platteville, Wisconsin, and the surrounding communities, our friendly staff is ready to assist you.

    Feel the thrill of the road and make every drive extraordinary. Schedule a test drive today and discover why the Dodge Charger R/T stands out in the world of performance sedans. Visit us in Platteville or reach out via call or email for more details. Your adventure starts here! 🚗✨
    Description is written by Ai based on information provided about the vehicle. Ai is new and can be incorrect. Please verify vehicle details with the dealership.

    No Fear Warranty Coverage detail

    What the No Fear limited warranty includes

    Straight from the program terms.

    10-Year / 100,000-Mile Limited Warranty

    10-year / 100,000-mile term, measured from the delivery odometer reading Exclusions and benefit limits apply
    How long does coverage last?

    The warranty is valid for 10 years or 100,000 miles, whichever comes first, or until you sell or transfer the vehicle, and is non-transferable. The 100,000 miles are measured from your vehicle's odometer reading on the date you take delivery.

    What does it cost?

    No Fear coverage is included with the purchase of an eligible vehicle. When you bring the vehicle in for a covered repair, you pay a $100 deductible for that visit. Benefit limits apply, with total benefits not to exceed $6,000. Comprehensive Coverage is available as an optional paid upgrade.

    What is not covered?

    Wear items and components not covered by the limited warranty, such as tires, battery, paint, clock, upholstery, and radio, along with anything already covered by the manufacturer warranty. A $100 deductible applies to each repair visit, and benefit limits apply. Certain uses (commercial, towing, racing, plowing, principally off-road) and unauthorized repairs are excluded.

    See complete terms, benefit limits, and program exclusions. No Fear Terms and Conditions

    Dealership Information

    Sunday

    Closed

    Monday

    9:00am - 7:00pm

    Tuesday

    9:00am - 7:00pm

    Wednesday

    9:00am - 7:00pm

    Thursday

    9:00am - 7:00pm

    Friday

    9:00am - 6:00pm

    Saturday

    9:00am - 5:00pm

    Kunes Chrysler Jeep Dodge RAM of Platteville

    Get pre-qualified in just a few taps

    When you're searching for the perfect vehicle, it helps to know if you qualify for the financing you need. Get pre-qualified in just a few taps, with no effect on your credit score.

    Powered by

    motive logo

    Disclaimer

    Pricing:Vehicle prices shown on this website do not include applicable taxes, title fees or license fees, which will be due at the time of signing. The advertised price does include our document service fee (which may be shown as a Documentary Fee or Dealer Services Fee, and is referred to in Wisconsin as a Service Fee) and a mandatory eFiling fee. Document service fees are $377.63 in Illinois, $350.00 or 10% of the sale price (whichever is less) in Minnesota, $180.00 in Iowa, and $599.00 in Wisconsin. The eFiling fee displayed assumes the buyer resides in the same state as the dealership location, and are as follows: Illinois residents - $35, Iowa residents - $15, Minnesota residents - $60, Wisconsin residents - $38. If you are an out-of-state resident, your actual eFiling fee will be confirmed by a Kunes associate before you finalize your purchase. Unless a different expiration date is stated with a specific offer, advertised prices and offers are effective as of the date and time shown on the page and expire at the earliest of: (a) the time the price or offer is updated or removed on this website; (b) the sale of the vehicle; or (c) 11:59 p.m. Central Time on the date shown. Updated prices and offers apply from the time they are posted. Manufacturer incentives and other offers that state an expiration date are valid through that date, subject to program rules and vehicle eligibility. Your final price, including taxes and government fees, will be confirmed in your written purchase agreement. Please contact your local Kunes dealership to confirm vehicle availability before visiting. MSRP may not represent actual sales price.

    Rebates, Incentives & Advertised Discounts:Offers listed under “Other Offers You May Qualify For,” if any, are not included in the advertised price. They may be subject to eligibility restrictions, including residency requirements, financing source requirements, and vehicle or trim level eligibility. Some of these offers require financing through the manufacturer’s captive lender or are available only to residents of specific states or regions. Please contact a Kunes associate to confirm which additional offers apply to your specific vehicle and situation.

    Finance & Lease Payment Estimates:Any finance payment amounts shown on this website are estimates only, calculated based on a combination of the amount financed, the annual percentage rate (APR), and the loan term. Actual payment amounts will depend on your individually approved credit terms. Not all buyers will qualify for advertised rates or financing. All financing is subject to credit approval by the lending institution. A complete breakdown of your financed amount, APR, number of payments, and total payment obligation will be provided to you in writing prior to signing.Any lease payment amounts shown are estimates calculated using the manufacturer’s offered residual value, the lease term in months, and the annual mileage allowance. Lease payments do not include acquisition fees, disposition fees, taxes, or other charges that may be due at signing or at lease end. Not all customers will qualify for lease programs.Lessees must meet lender credit requirements. Complete lease disclosures, including total amount due at signing and total lease obligation, will be provided prior to execution of any lease agreement in accordance with the federal Consumer Leasing Act.

    Vehicle Information & AvailabilityVehicle listings on this website are provided for general informational purposes. While every effort has been made to ensure accurate display of vehicle information, including equipment, accessories, colors, and specifications, data is sourced from multiple providers and may not always reflect the exact configuration of a specific vehicle. If a particular feature matters to your purchase, please confirm it with a Kunes associate before you sign. Photos of new vehicles may be representative stock images. See the vehicle details for the vehicle’s color and equipment. Pre-owned (used) vehicles are not guaranteed to have two (2) keys. All inventory is subject to prior sale.Vehicles may be transferred between Kunes Auto Group locations at customer request. A transfer fee of $300 will be added to the purchase transaction to cover transportation costs when a vehicle is moved from its listed location. To avoid this fee, customers may take delivery of the vehicle at the dealership where it is currently listed for sale. Please contact the dealership where the vehicle is located with any questions about that vehicle.

    No Fear Limited WarrantyIf a vehicle is advertised with the No Fear Limited Warranty, coverage is subject to the terms, deductible and benefit limits in the written warranty, which is available for review at the dealership before purchase. Not all vehicles qualify.

    Fuel Economy (EPA) RatingsAny fuel economy figures shown are based on the model year EPA mileage ratings and are provided for comparison purposes only. Your actual fuel economy will vary depending on how you drive and maintain your vehicle, driving conditions, vehicle load, climate, and other factors. For hybrid and plug-in hybrid vehicles, fuel economy will also vary based on battery pack age and condition. For more information about EPA fuel economy ratings, visit www.fueleconomy.gov.

    2026 Dodge® Charger

    R/T

    • MSRP (Including Destination Charges)
      $60,695
    • Dealer Services Fee
      +$599
    • Electronic Filing Fee
      +$38
    • Dealer Discount
      -$4,651
    • Total Selling Price
      $56,681
    • Tax, Title, & License Extra
    • Total Rebates / Cash Allowance
      -$5,643
    • 2026 National Employee Pricing Plus Retail Bonus Cash
      -$1,000
    • Employee Price Dealer Disc. (Retail Purchase only)
      -$4,643

    • Net Price
      $51,038